HomeEV Charging & RenewablesWorkplace EV charging

Workplace EV charging.

Workplace charging that matches how your fleet and staff actually park. We design the capacity once, install the bays you need now, and make phase two a bolt-on rather than a dig-up.

EV Charging & RenewablesNICEIC Approved Contractor12-month guarantee
A row of workplace EV charging bays outside a commercial office building

What’s included.

  • Staff and fleet charging: bays planned around how your vehicles actually arrive, park and leave
  • Load management: charging shared across the site supply without tripping the building
  • Phased rollout: start with a handful of bays and grow as uptake grows, on capacity designed day one
  • Billing and access: apps, RFID or open access, set up for how you want to run it
  • Signage, bays and civils: the whole job coordinated, not just the electrical part

Who we do this for.

Business owners

Charging that works for staff and visitors without outgrowing the supply or the budget.

Fleet managers

Depot charging designed around shift patterns and turnaround times, not a brochure.

Landlords & agents

Charging as a site amenity, sub-metered and billed fairly across tenants.

How a job runs.

Tell us about the job

Form, phone or WhatsApp. You deal with the person who prices the work and stands behind it.

Survey and a straight quote

We look at the job properly before we price it. The quote says what is included and what is not.

The work, done tidily

Booked in, done when we said, and left clean. Any surprises get discussed before they get done.

Tested, certificated, guaranteed

Every job is tested, certificated where applicable, and covered by our 12-month workmanship guarantee.

Asked before booking.

Do you install workplace charging in phases?

Yes. Most businesses start with a handful of bays and grow as uptake grows. We design the capacity and containment for the full plan on day one, so phase two is a bolt-on rather than a dig-up.

Will chargers overload our building supply?

Not designed properly. Load management shares the available capacity across active chargers, and the survey establishes what your supply can actually carry before anything is specified.

How do staff pay for their charging?

However suits your policy: free as a perk, billed through an app or RFID cards, or split between staff and fleet rates. The back office is part of the design conversation, not an afterthought.

Can visitors and customers use the chargers too?

Yes, with access and tariffs set per group. Plenty of sites run staff bays and open visitor bays side by side on one managed system.

What about the non-electrical work: bays, signage, civils?

We coordinate the whole job. Trenching, ducting, bay marking and signage are planned with the electrical design so the site ends up finished, not just powered.

Is workplace charging certificated?

Every installation is tested, certificated and notified as required, with the documentation handed over for your premises file and your insurer.

Tell us about the job.

Send it through in under a minute, call, or WhatsApp us a photo of the job. You deal with the people doing the work, not a call centre.

QuoteCall now