EV charging, from one drive to a whole development.
Home chargers installed in a day. Workplace charging designed around how your site parks. Whole blocks of flats planned from the supply up. One firm designs, installs, tests and certificates all of it.
Where do you need charging?
Home EV charging
Wall or post-mounted chargers on your drive, surveyed, installed, tested and certificated. Usually in a day.
Home EV charging →Workplace EV charging
Staff, fleet and visitor charging for offices, depots and retail sites, designed for how your site actually parks.
Workplace EV charging →Commercial EV charging
Charging for blocks of flats, developments and commercial sites: load management, metering and phased design.
Commercial EV & flats →
The survey comes first. Every time.
An EV install stands or falls on the supply behind it. Before anything is booked we check the main fuse, the existing load and the sensible position for the charger, so the install day holds no surprises and the charger never fights the rest of the building.
- Load management where the supply is tight, instead of nuisance trips
- Supply upgrades handled with the DNO where they are genuinely needed
- Certificated and notified: every install tested, certificated and notified before we leave
And renewables?
Today we install the low-carbon kit that is already mainstream: EV charging everywhere, and dedicated supplies for heat pumps and air conditioning. Solar and battery storage are on the roadmap, and this is where they will live when we offer them. If you are planning ahead, tell us: wiring a building renewables-ready costs least while other work is happening.
Heat pump & air con supplies
Dedicated circuits for heat pumps and air conditioning, coordinated with your mechanical installer so the supplies are ready when the kit arrives.
Renewables-ready wiring
Ducting, capacity and board space planned in during renovations and new builds, so solar or battery storage later is an addition rather than a rework.
EV today
Charging is the renewable transition most homes and sites make first, and it is the one we deliver every week.
Start with a home charger →Asked about EV charging.
How long does a home charger take to install?
Usually a day, including testing, commissioning and a walk-through of the app. The survey beforehand means the day itself holds no surprises.
Can our block of flats get charging?
Almost certainly, with the right design. Load management shares the building supply across bays, metering keeps billing fair, and phasing spreads the cost. It starts with a feasibility survey of the incoming supply.
Do you handle the DNO paperwork?
Yes. Every charger install is notified to the DNO on your behalf, and where a supply upgrade is needed we handle that application too.
Do you install solar panels?
Not yet. EV charging, and the electrical side of heat pumps and air conditioning, is what we deliver today. When renewables join the list, existing customers hear first.